Brookforge Swimming Pool Build

14-591

Swimming pool wall bracing.

Pool wall bracing

This is the third update for the underground basement swimming pool which is being constructed in Wimbledon, London. The quadlock swimming pool wall have now been finished with all the associated reinforcing steelwork secured. Once the Quad lock ICF wall has been has been constructed, aluminum strong backs are fixed to the wall and then […]

Swimming pool wall bracing. Read More »

Pool wall construction begins in London basement pool

Pool Hall Wall

Work begins for the pool wall construction on a twin depth basement swimming pool in London. The walls are being constructed using the Quadlock Insulated Concrete Form-work (ICF) system and is being built on a reinforced slab installed by the existing site workers from Brookforge drawings. The shallow water depth is 1.3m going down to

Pool wall construction begins in London basement pool Read More »

New build basement swimming pool

Digging a basement pool hall

Site excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser between them. The shallow water depth is 1.3m going down to a deep end water depth of 2m. The pool will be a skimmer pool

New build basement swimming pool Read More »

Scroll to Top