Southampton: Refurbishment Project

Depth increased, new skimmers installed and concrete tanked

We were asked to refurbish and improve an outdoor pool that was to be housed for year round use. The specification included increasing the depth of the entire pool, installing skimmers with an automatic top up, fitting new lights and install a modern plant room. A Calorex Delta air handling unit along with all ductwork was also specified and installed.