New Forest: Pool Braced for Concrete Pour

Quad-Lock is one of the more adaptable ICF systems, which enables alterations in the design to accommodate features such as steps, overflow channels, cover pits and balance tanks. To find out more about hidden cover options see here for further details. For any questions regarding ICF construction please get in touch here.

[12-150]

New Forest: New Insulated Pool Build

360 view from inside the swimming pool shell

A 360 view from inside the pool shell

A new insulated outdoor pool project in Hampshire, using the Quad-Lock ICF (Insulating Concrete Formwork) system.

Brookforge have pioneered the use of Quad-Lock in swimming pool construction and with Quad-Lock being so flexible, it is our ICF of choice. To read more about the Quad-Lock system read here.

Setting out is a critical stage of the project whereby accuracy is key. Once the reinforcement starter bars are anchored in, the rest of the construction can be completed extremely quickly.

[12-150]

External Ductwork Southampton

External ductwork, installed and ready for insulation

 

The newly built pool hall requires a fairly extensive air handling system to cope with the amount of glazing. Brookforge can design, supply and install the entire system with bespoke options to suit your needs. Contacts us here for a quote.

22m Child friendly play pool West Yorkshire

The client is extending a refurbishing large period dwelling to become a 52 bedroomed residence for friends and family. When the client’s project manager went on holiday days before a concrete pour and pool materials had not been ordered, the client turned to Brookforge for help Read More…