Pool ready for concrete!
After four days on site the insulated concrete form-work is up and braced. The pipework and conduits through the shell are in position and any shuttering for fixing points have been added. Final checks are made, the drawings are triple-checked and the braces are laser aligned. Everything is now ready for an early start the […]
Pool ready for concrete! Read More »