Pool ready for concrete!

After four days on site the insulated concrete form-work is up and braced. The pipework and conduits through the shell are in position and any shuttering for fixing points have been added. Final checks are made, the drawings are triple-checked and the braces are laser aligned. Everything is now ready for an early start the […]

Pool ready for concrete! Read More »

ICF Swimming pool shell is up in three days

The beauty of using insulated concrete form-work for constructing your pool is not only the thermal efficiencies and cost savings, but it’s quick, really quick!! The ICF blocks are lightweight and easy to handle, meaning one person could move an entire pool shell by hand to it’s location with ease. The wall ties are high

ICF Swimming pool shell is up in three days Read More »

Swimming Pool Plant Room Installation

Cliff side infinity pool

Brookforge pool engineers recently helped complete a swimming pool plant room installation for a cliff edge pool in Salcombe. The pool was built and tiled by a local pool company and Brookforge took over to install all the pool shell fittings and install/test/commission the highly automated pool plant room. Working directly for the owner; our

Swimming Pool Plant Room Installation Read More »

Installing swimming pool balance tank

Lifting balance tank into position

With any overflow pool the ability to maintain the flow of water can be achieved with a swimming pool balance tank. The swimming pool balance tank allows for surges of water from the overflow channel to be temporarily stored so a constant flow of water can be maintained through the plant room water treatment systems. Below

Installing swimming pool balance tank Read More »

Swimming Pool Refurbishment Complete

Swimming pool refurbishment

A swimming pool refurbishment has successfully completed just in time for the sun coming out this weekend. The existing outdoor pool overlooks a Cotswold valley and required a complete refurbishment. The pool had fallen into a sorry state after nearly 40 years of use so needed stripping out for a complete refurbishment and bringing up

Swimming Pool Refurbishment Complete Read More »

New Build Outdoor Pool

Quadlock Infinity Edge

Work has begun on a new build outdoor pool in the the Chilterns near High Wycombe. The swimming pool has been designed by liaising direct with the clients and the initial pool slab has been constructed by local contractors using the drawings and structural calks provided by Brookforge. The reinforced concrete slab had a 5

New Build Outdoor Pool Read More »

New design outdoor pool completed

New Build Outdoor Pool 3D

A new design outdoor pool has been completed by our in house designers. Working directly with the customers; our project manager has finalized the designs for this unique pool. This bespoke swimming pool is ready to go from paper drawings to being constructed onsite over the next 3 weeks. The pool will be constructed using the

New design outdoor pool completed Read More »

Hidden overflow pool and spa in basement of new build house

Overflow spa with massage jets

A new build house in Hale, Greater Manchester required a luxury basement pool and spa to compliment a wellness suite. Working directly with the customer and liaising with their architect ensured Brookforge could design and build a hidden overflow pool and spa which fitted within the desired budget. As this was a basement pool project

Hidden overflow pool and spa in basement of new build house Read More »