Starter Bars Fixed, Construction of Structure Begins, Romsey

The Romsey project is making good progress. The starter bars have been fixed to the slab, and the construction of the pool and balance tanks walls has begun using the Quad-Lock system.

For more information about swimming pool construction using Quad-Lock, click here; alternatively contact us on 01242 573572.

Concrete Poured, Moreton in Marsh

The swimming pool, balance tanks, spa and steps have been poured

Concrete Poured Successfully

This project comprises of a large spa bath, uniquely shaped deck level pool and balance tanks for each. The pool will have an insulated slatted cover which will be hidden when closed. Colour changing LED lights will be used to light up the water. These are controllable and compatible with automation systems.

Insulation

Insulation has been a priority throughout this project. The project location is fairly exposed and is predominantly in the shade. Insulation panels have been installed externally and Quad-lock panels forming the pool’s internal structure. The slab will also be insulated, as will the base in the spa. The purpose of this insulation is minimise heat loss through the structure, thus saving potentially thousands compared to an uninsulated pool. The insulated slatted cover will help to counteract heat loss through evaporation.

Hydrotherapy Spa Tiled, East Sussex

The tiling for the Hydrotherapy Spa has been finished, all that remains are the finishing touches to complete the surround. The spa comprises four separate seats and an air massage bed in the middle. There are both air and water jets, and colour changing lights that contribute to the sensory experience.

If you are interested in having a Hydrotherapy Spa constructed, why not get in touch here to discuss your options.

Hydrotherapy Spa Rendered, East Sussex

A hydro-therapy massage bench ready for tiling

The spa requires rendering prior to tanking

Hydrotherapy Spa Rendered

Using specialist products, which can be found on our Pool Construction Products, the Quad-Lock shell is rendered prior to

tanking. The bench in the middle is an air massage bed, which will be both sensory and

relaxing for its users at this specialist school for children with disabilities.