New Basement Pool Project, London: Slab Installation

Reinforced concrete slab designed to withstand the force of a large volume of water. The following day, construction of the pool shell can begin. It doesn’t take long before the shape of the final product emerges.

[12-1129]

Completion: Partially Constructed Pool is Finished, Wimbledon

Basement Pool

Works on this basement pool were started by a local swimming pool company. Brookforge were appointed to to take over the pool works.

Brookforge worked with the completed bare pool shell. We explained all the aesthetic options to the client. High spec options were chosen: Stainless steel shell fittings, a Covrex automatic slatted cover, fibre optic lighting, energy saving Pentair Intelliflo pumps,  Besgo automatic backwash valves, ozone water treatment and automatic chlorine and pH dosing.

Brookforge can offer expert assistance and can take over partially completed projects where, for whatever reason a change of pool contractor is required.


			

Luxury Indoor Basement Pool Alderley Edge

Alderdale Indoor Pool

This Luxury high end indoor swimming pool in Alderley Edge was constructed in the basement of a new build house.

Brookforge worked along side the luxury developers Huntsmere Projects to achieve a modern contemporary finish.

It benefitted from LED lights, stainless steel fittings throughout and an automatic slatted cover system which was hidden away in a cave at the far end of the pool, thus preventing heat loss when not in use.
Read More…

Underground Basement Pool London

Cad Screen GrabWith the lack of available land and tight planning regulations above ground, the answer in many cases is to go underground. The client partnered with a property developer to extend his own development property underground.

Without the necessary experience in pool design & build, the client turned to Brookforge for pool design and off site consultancy services. Brookforge designed the pool shell, provided stainless steel swimming pool hydraulic fittings and LED lights and specified and supplied a Heatstar climate control unit and specified the plant room equipment required. More pics to follow>

Ref: 8-925