Pool and Spa Shell Tanked, Moreton-in-Marsh
For pool and spa construction, or to place an order for waterproofing and technical construction products – call us on 01242 573572
Pool and Spa Shell Tanked, Moreton-in-Marsh Read More »
Brookforge Swimming Pool Build
The fully insulated pool shell can help retain the heat within your pool water and thus reduce running costs. The ICF system can also incorporate the latest swimming pool equipment including automatic heat retention covers, counter current units, hydro-massage jets and LED/Fibre optic lighting.
Below is a selection of fully insulated ICF swimming pools completed by Brookforge
For pool and spa construction, or to place an order for waterproofing and technical construction products – call us on 01242 573572
Pool and Spa Shell Tanked, Moreton-in-Marsh Read More »
The steps and deck level edges have been finished and stainless steel mesh applied to the spa and pool shell, ready for rendering.
Steps and Deck Level Edges Finished, Hale Cheshire Read More »
The tiling for the Hydrotherapy Spa has been finished, all that remains are the finishing touches to complete the surround. The spa comprises four separate seats and an air massage bed in the middle. There are both air and water jets, and color changing lights that contribute to the sensory experience. If you are interested
Hydrotherapy Spa Tiled, East Sussex Read More »
Concrete Pour Complete Because the structures are unified, both the balance tank and hydrotherapy pool are poured as one. This ensures a homogeneous mix without the risk of cracking which can occur when two mixes are poured at different intervals. The concrete will be allowed to cure before the removal of supports, the project will
Concrete Poured – Hydrotherapy Spa, East Sussex Read More »
The Quad-Lock shell for both spa pool and balance tank is nearly complete. A twin wall of insulation provides a substantial reduction in heat loss. The balance tank and spa shell are a homogenous structure, the union of the two elements adds rigidity and strength to both.
Quad-Lock Construction Complete for Hydrotherapy Spa Pool, East Sussex Read More »
Brookforge have undertaken a new project at a school which educates children with disabilities. We are constructing a specialist hydrotherapy pool which will be both stimulating and relaxing for its users; the older children. The pool will include a series of lights and jets, and will feature an air massage bed. For more information on
Setting Out Hydrotherapy Pool, East Sussex Read More »
Today we have successfully poured 52 cubic metres of concrete to form the walls, balance tanks and cover lid. As this post goes live, the concrete is curing; resisting the low temperatures with double sided insulation. This stage is a key development within the project and could not be achieved so quickly with alternative pool
New Forest: Concrete Pour Read More »