Brookforge Swimming Pool Build

Featured

Featured pool for the front gallery

Work begins on 15m outdoor pool

Brookforge supplied drawings for the ground workers to install a re-inforced concrete slab. Now work can begin on the building the ICF Quadlock Walls. The initial shape and size of the pool is laid out before it has galvanised track added to be tied into the slab, reinforced vertical steelwork is then installed into the […]

Work begins on 15m outdoor pool Read More »

Completion: Self Contained Plant Room, Destination Nigeria.

shipping container pool plant room

This recently completed self-contained plant room has been entirely built inside a standard 20 foot shipping container. The client in Nigeria required a commercially rated system with automatic chemical dosing amongst other automatic features. The plant room has been fully tested using a large tank of water to simulate the high volume turnover it was

Completion: Self Contained Plant Room, Destination Nigeria. Read More »

New Forest: Quad-Lock Construction Update

ICF quad lock pool walls in construction

The majority of the Quad-Lock structure has been completed, along with reinforcement steels. The remainder of structure will be completed shortly and prepared for concrete pouring. The top of the Quad-Lock walls are cut to laser level ensuring that any inaccuracies in the slab are overcome before the finished floor level. [12-150]

New Forest: Quad-Lock Construction Update Read More »

Southampton: Refurbishment Project

Swimming pool refurbishment

We were asked to refurbish and improve an outdoor pool that was to be housed for year round use. The specification included increasing the depth of the entire pool, installing skimmers with an automatic top up, fitting new lights and install a modern plant room. A Calorex Delta air handling unit along with all duct-work

Southampton: Refurbishment Project Read More »

Completion: Luxury Deck Level Pool and Spa

A perfect union of minimalism and grandeur. It is hard to believe that a commercially rated, fully insulated 18m swimming pool and separate spa are concealed within this subtle design. With the covers open, the space in front of the house is transformed into an area of tranquility and repose, a space in which to socialise, entertain and soak

Completion: Luxury Deck Level Pool and Spa Read More »

Completion: Primary School Pool Refurbishment, Cheltenham

Brookforge swimming pool tilers in action

This pool was in need of major refurbishment in order to be useable by the children for the new school year. The pool had previously been painted, this became a yearly task and did not leave a decent finish. The coping stones surrounding the pool were cracked and in desperate need of replacement. The plant

Completion: Primary School Pool Refurbishment, Cheltenham Read More »

Completion: Partially Constructed Pool is Finished, Wimbledon

Basement Swimming Pool

Works on this basement pool were started by a local swimming pool company. Brookforge were appointed to to take over the pool works. Brookforge worked with the completed bare pool shell. We explained all the aesthetic options to the client. High spec options were chosen: Stainless steel shell fittings, a Covrex automatic slatted cover, fibre

Completion: Partially Constructed Pool is Finished, Wimbledon Read More »

Scroll to Top