Brookforge Swimming Pool Build

May 2015

Swimming pool wall bracing.

Pool wall bracing

This is the third update for the underground basement swimming pool which is being constructed in Wimbledon, London. The quadlock swimming pool wall have now been finished with all the associated reinforcing steelwork secured. Once the Quad lock ICF wall has been has been constructed, aluminum strong backs are fixed to the wall and then […]

Swimming pool wall bracing. Read More »

Pool wall construction begins in London basement pool

Pool Hall Wall

Work begins for the pool wall construction on a twin depth basement swimming pool in London. The walls are being constructed using the Quadlock Insulated Concrete Form-work (ICF) system and is being built on a reinforced slab installed by the existing site workers from Brookforge drawings. The shallow water depth is 1.3m going down to

Pool wall construction begins in London basement pool Read More »