Concrete Poured – Hydrotherapy Spa, East Sussex

Concrete for both spa and balance tank is poured in one

Concrete Pour Complete

Because the structures are unified, both the balance tank and hydrotherapy pool are poured as one. This ensures a homogenous mix without the risk of cracking which can occur when two mixes are poured at different intervals. The concrete will be allowed to cure before the removal of supports, the project will then proceed with the internal structure of the spa.

Tiling Nears Completion, Cheltenham

Edging tiles are fixed

The surround tiles have nearly been finished, with the pool tiles not far behind. Stainless steel skimmers with an automatic top-up have been installed. A chromed stainless steel faceplate will be installed after tiling is finished. To view the construction products used please follow this link.

Product Feature: The IntelliFlo VF Pump

The Intelliflo Variable Flow Pump is a digital revolution within the industry. An intelligent onboard computer determines the minimum required flow rate for each task, whether its a backwash¬†or the pool is simply being vacuumed, the minimum flow rate required is calculated using information entered into the computer upon installation. Read More…

Quad-Lock Construction Complete for Hydrotherapy Spa Pool, East Sussex

The Quad-Lock shell of the hydrotherapy spa pool is nearly complete

The Quad-Lock shell for both spa pool and balance tank is nearly complete. A twin wall of insulation provides a substantial reduction in heat loss. The balance tank and spa shell are a homogenous structure, the union of the two elements adds rigidity and strength to both. Read More…