New Forest: Post Concrete Update
[12-150]
New Forest: Post Concrete Update Read More »
Brookforge Swimming Pool Build
Today we have successfully poured 52 cubic metres of concrete to form the walls, balance tanks and cover lid. As this post goes live, the concrete is curing; resisting the low temperatures with double sided insulation. This stage is a key development within the project and could not be achieved so quickly with alternative pool
New Forest: Concrete Pour Read More »
Quad-Lock is one of the more adaptable ICF systems, which enables alterations in the design to accommodate features such as steps, overflow channels, cover pits and balance tanks. To find out more about hidden cover options see here for further details. For any questions regarding ICF construction please get in touch here. [12-150]
New Forest: Pool Braced for Concrete Pour Read More »
This recently completed self-contained plant room has been entirely built inside a standard 20 foot shipping container. The client in Nigeria required a commercially rated system with automatic chemical dosing amongst other automatic features. The plant room has been fully tested using a large tank of water to simulate the high volume turnover it was
Completion: Self Contained Plant Room, Destination Nigeria. Read More »
Click here to see a 360 view of your new site in Hampshire. We will update the blog with more 360 shots as the build develops. [12-150]
360 View of New Forest Site Read More »
Brookforge can design, supply and install duct-work for air handling units. We can tailor the design to suit your needs with respect to glazing etc. Why not contact us for a quotation?
Ductwork for Air Handling Unit, Southampton Read More »